Time:2023-12-18 source:other news Popular:display shelving wholesaler Views:900

1. Fire separation measures should be taken between the loading and unloading (sorting) operation area and the storage area, and the structural stress system of the loading and unloading (sorting) operation area and the storage area should be relatively independent to ensure that there is no overall collapse in the event of a fire; The maximum allowable building area of the fire compartment in the loading and unloading (sorting) operation area can be determined by referring to Table 3.3.1 of the current national standard "Code for Fire Protection Design of Buildings" GB 50016-2006 for Class C factory buildings; The maximum allowable floor area of the storage area and the maximum allowable building area of the fire compartment can be determined in accordance with the provisions of Note 4 in Table 3.3.2 of the current national standard "Code for Fire Protection Design of Buildings".
The fire resistance rating of the logistics distribution center building should not be lower than level two. The logistics distribution center for steel structured shelves should use reinforced concrete columns, or steel columns should be coated with fire-resistant materials, or a combination of coatings and fire-resistant materials can be used to achieve the corresponding fire resistance limit specified in the specifications.
3. The number and width of safety exits, evacuation distance, and evacuation stairs in the loading and unloading (sorting) operation area and storage area should respectively comply with the relevant regulations of Class C factory buildings and warehouses in the current Code for Fire Protection Design of Buildings.
4. The loading and unloading (sorting) operation area and storage area should be equipped with automatic fire extinguishing systems, automatic alarm systems, and smoke exhaust facilities in accordance with the current national standard "Code for Fire Protection Design of Buildings".
5. The shelf building of the logistics distribution center should be equipped with a circular fire lane, and a fire fighting surface should be arranged within at least 1/4 of the length of the long side or the surrounding area, and not less than one long side length range. A staircase or entrance that leads directly to the outside should be set up within the fire fighting surface range, and there should be at least 15-18m of open space on one side of the fire fighting surface that can carry out fire operations.
Read recommendations:
3-Tier Indoor Outdoor Plant Display Shelf / Metal Plant Shelf / Metal Plant Stand / Plant Rack / Flo
What are the advantages of attic shelves compared to traditional shelves.storage shelving units for
Last article:4 tier steel wire shelf custom.Can warehouse shelves really improve the quality of warehouse managem
Next article:5 forms of low-temperature storage facilities
Popular Recommended Products
3-Tier Display Shelving / Steel Wire Shelf Rack / Custom Steel Wire Racks
2022-11-154-Tier Wire Shelving Unit / NSF Chrome Wire Shelf / Wire Storage Rack / / For Living 4-Tier Chrome
2021-05-315-Tier Wire Storage Rack / Steel Organizer Wire Rack Chrome / Custom Steel Wire Racks
2021-05-31MZG Steel Storage Shelving 5-Tier Wide, Chrome
2023-10-25MZG Steel Storage Shelving 4-Tier, Black
2023-10-25Safety problems in the use of storage shelves
2022-12-12What is the load bearing bearing bearing bearing?cabinet shelf Manufacturing
2023-06-05Recommended solutions for warehouse shelves in clothing enterprises
2024-07-27white wire shelving unit Factory.What are the functions of the shelves
2023-11-27What issues should be noted when customizing and installing warehouse shelves?
2024-08-294-shelf wire storage rack price
2023-04-122 tier steel wire shelf manufacturer
2023-03-255 tier wire shelving unit
2023-03-25storage shelving unit white
2023-03-25