Time:2023-12-18 source:other news Popular:display shelving wholesaler Views:900

1. Fire separation measures should be taken between the loading and unloading (sorting) operation area and the storage area, and the structural stress system of the loading and unloading (sorting) operation area and the storage area should be relatively independent to ensure that there is no overall collapse in the event of a fire; The maximum allowable building area of the fire compartment in the loading and unloading (sorting) operation area can be determined by referring to Table 3.3.1 of the current national standard "Code for Fire Protection Design of Buildings" GB 50016-2006 for Class C factory buildings; The maximum allowable floor area of the storage area and the maximum allowable building area of the fire compartment can be determined in accordance with the provisions of Note 4 in Table 3.3.2 of the current national standard "Code for Fire Protection Design of Buildings".
The fire resistance rating of the logistics distribution center building should not be lower than level two. The logistics distribution center for steel structured shelves should use reinforced concrete columns, or steel columns should be coated with fire-resistant materials, or a combination of coatings and fire-resistant materials can be used to achieve the corresponding fire resistance limit specified in the specifications.
3. The number and width of safety exits, evacuation distance, and evacuation stairs in the loading and unloading (sorting) operation area and storage area should respectively comply with the relevant regulations of Class C factory buildings and warehouses in the current Code for Fire Protection Design of Buildings.
4. The loading and unloading (sorting) operation area and storage area should be equipped with automatic fire extinguishing systems, automatic alarm systems, and smoke exhaust facilities in accordance with the current national standard "Code for Fire Protection Design of Buildings".
5. The shelf building of the logistics distribution center should be equipped with a circular fire lane, and a fire fighting surface should be arranged within at least 1/4 of the length of the long side or the surrounding area, and not less than one long side length range. A staircase or entrance that leads directly to the outside should be set up within the fire fighting surface range, and there should be at least 15-18m of open space on one side of the fire fighting surface that can carry out fire operations.
Read recommendations:
5-Tier Slanted Wire Shelving Unit / SMT Material Storage Rack / Steel Wire Rack Manufacturer
storage shelving units distributors
Mold shelf production process.storage shelving units for home
Last article:4 tier steel wire shelf custom.Can warehouse shelves really improve the quality of warehouse managem
Next article:5 forms of low-temperature storage facilities
Popular Recommended Products
Heavy Duty Wire Garment Rack, Metal Clothing Rack with Hanging Rods / Freestanding Open Wardrobe Org
2022-11-15Adjustable Wire Shelving Clothes Rack with Rods
2026-09-23Green cloth box
2022-11-115-Tier Wire Corner Shelving Unit / Metal Wire Storage Rack / 18 x 36 Chrome Wire Shelf
2022-11-17Rolling Clothes Rack with Wheels / Metal Clothing Rack / Clothes Garment Coat Rack with Bottom Shelf
2022-11-29wire storage racks with wheels manufacture.How to reduce costs in the process of enterprise warehous
2023-11-21Three key points to pay attention to when customizing storage shelves
2024-09-09Can heavy warehouse shelves be installed in a single row?wire storage rack with baskets Factory
2023-06-14Equipment significance of shelves
2022-12-14wire closet shelf liner.What are the characteristics of the new supermarket shelves?
2024-06-14white wire shelving unit Production
2023-04-125 shelf wire storage rack company
2023-03-252 tier steel wire shelf Manufacturing
2023-03-25white wire shelving unit Solution
2023-03-25